Building and Commissiononing a Cell site: Procedure

• Commercial inputs given to Technical listing the coordinates where a particular cell-site is needed

• Design documents (DDs) floated by Technical- Cell Planning Team

• Site survey by(Technical Logistics + Cell Planning +Transmission Planning+ Production)

• Technical logistics to execute the contract agreement once the site location gets finalized

• Energization status checked (i.) by Technical logistics

• Site handed over to Production for build-out (Civil Works)

• Once civil work gets completed site handed over to BSS deployment team for commissioning

• Once site gets on-air the site finally handed over to OAN (Operation Access Network)

Hyper activism – hip hop

Building and Commissiononing a Cell site: Procedure

• Commercial inputs given to Technical listing the coordinates where a particular cell-site is needed

• Design documents (DDs) floated by Technical- Cell Planning Team

• Site survey by(Technical Logistics + Cell Planning +Transmission Planning+ Production)

• Technical logistics to execute the contract agreement once the site location gets finalized

• Energization status checked (i.) by Technical logistics

• Site handed over to Production for build-out (Civil Works)

...